HELP, please!
I used 1.0.0 for a long time and it worked fine. Three days ago, when calculating a batch process (dense cloud, high, 6 chuncks with ~40 cameras each, expected number of points around 8 million) the program got "stuck" at 95% of the first dense cloud in the reconstructing depth step, no remaining time shown. The elapsed time kept increasing to 145 hours. At that point I tried to the job via "cancel", which had no effect. Memory usage waas a ~2 GB of 8 available, CPU power was at 100% for one, with the remaining 15 idling.
I had to end photoscan via the task manager (end task).
I rebooted and tried again, this time with only one chunk. Same result, this time stuck at 92%, no time remaining shown.
I tried again, using a smaller box for the point cloud, and that worked.
I tried again, with a somewhat larger box, and it failed again.
I upgraded to 1.0.2 and keep having the same problem.
The size of the jobs is so small that normally Photoscan handled them within less than an hour without problems. It is not a memory issue (never more than 66% of available memory used). it is not a CPU issue, either.
I tried uninstalling and reinstalling - no change.
The "critical" size seems to be anything that calculates the depth reconstruction for more than 40 minutes.
Any suggestions how I can get this to work again? If needed I can post files.