Hi all,
Is there good/best practice for GCP Placement, when doing stockpile measurements? I obviously don't want to climb the thing, so I would guess at the base, as near as possible.
Is there a rule of thumb that we will need 1 per every X meter of circumference?
Would it be a good idea to measure out a long scale bar as a check as well ?